E1C03:How long must an operator wait after filing a notification with the Utilities Technology Council (UTC) before operating on the 2200-meter or 630-meter band?
Direct answer summary (2024-2028 NCVEC pool)
The official correct answer for E1C03 is Operators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies.
Use this action or method: Operators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies. It is the choice that directly completes the job described in the question.